You will develop a project schedule utilizing the following concepts covered in
You will develop a project schedule utilizing the following concepts covered in the course:
Develop a simple Gantt chart
Utilize Predecessors/ Dependencies to develop flexible dynamic schedules
Develop Critical Path schedules
Utilize Baselines to manage project changes
Utilize Custom Fields
Demonstrate the concepts covered in Work, Units, Duration
Demonstrate project leveling concepts
This assignment is individual, each student works alone and submits their own file.
Instructions:
Download the starter project file from here –> ProjectAutoStart.mpp Download ProjectAutoStart.mpp
When prompted enter your 9 digit student number and hit enter.
This file contains 10 tasks with only durations. You must input the names of the tasks necessary so this file represents a project for a product or service. The project must be related to your field of studies. You may add tasks as needed. You may alter task durations as long as you still meet all the requirements listed below. You may add more resources to the project as needed.
Include the following deliverables:
Ensure predecessors are assigned to create a logical Gantt chart schedule for your project. Some tasks should not be on the critical path.
Set predecessor dependency types to show tasks using at least 1 of each of the 4 types. Ensure that you have one of every type.
Include at least one positive lag and one negative lag for the predecessors of some tasks. Some of your tasks should not use any leads or lags.
Add your name as a resource. Assign yourself a Standard Rate. Put your name as the person doing the work on at least 3 tasks.
Set a baseline to record the current task durations and costs.
Create a resource called Pat. They are a junior resource and work for $15 per hour. Use your helper Pat for tasks not on the critical path.
Make task 9 fixed work. Then double the resources so that the duration changes to half the original number.
Set task 8 for one day of work, ensure it is on the critical path. Make sure it is half done. Set a new Baseline. Change the duration for task 8 to add one extra day. The revised task must be set to half done to receive full marks.
Enter notes for tasks 3, 4, 5 and 6. These notes should explain risks. For each note include the following
Clearly state a risk related to the selected task
Name the response strategy you would employ
Explain how that strategy is used to respond to that risk
Each of the tasks should use a different risk response so that you use all 4 risk response types covered in the course.
Enter notes for tasks 8, 9 and 10 that explain the estimating method used to determine either the cost or the duration. Use the 3 different estimating methods covered in course (a different one for each). Clearly indicate the name of the estimating technique, if it was used for cost or duration, and how the technique is used in this case.
Add an entry for 11 that is a summary of tasks 12 and 13. Ensure tasks 12 and 13 have their relevant data filled in.
Use leveling to create a task that is split into 2 parts. This can be done with existing tasks or by adding new tasks to the project.
Modify or add tasks to create a WBS with tasks of level 2 or higher (default is 1.1.1). Change the default WBS numbering scheme to something other than the default style.
Ensure a baseline is shown graphically on the Gantt chart.
Add a Custom Field, type Flag. Name the field “Modified”. Set the value to Yes for tasks 8, 9, 11 and for your split task.
Set the table view in your project to show the baseline duration columns for both baselines you set. Hide the Start and Finish columns. Show the columns for type and WBS.
Submit your completed MPP file for evaluation. The evaluation scheme for the final project is -1 for each error.
NOTE: This is a college-level project so DO NOT use any AI tools to write the project. Please read and follow all the instructions carefully and make the required Project. Make a MPP file. I have attached a ProjectAutoStart.mpp file find it attached. THIS IS A URGENT PROJECT MAKE IT ASAP PLEASE!